Latest Entries
Floor membrane I

Floor membrane I

We laid down the membrane for the laminate flooring on top of the plywood, This Zito membrane has adhesive joints and we also used vapor barrier tape to make sure everything stays in place.We have to wait another 24 hours before installing the actual floor. As per the instructions, we have to let the flooring … Continue reading →

Dryer Vent

Dryer Vent

Our dryer is installed in the basement bathroom because there’s no dryer vent upstairs. We have to wash our clothes then run down in the basement to dry them. Today, Ventstat installed the vent in our kitchen. Now, we’ll have to find someone to move the dryer. Continue reading →