The old body jets have been removed and a waterproof membrane and acrylic base have been installed. Continue reading
Monthly Archives: September 2014
Shower demolition
Today’s shower demo brought many surprises, A tangle of Medusa-like pipes plus shower walls and base made of 1 inch concrete. Our contractor had to jackhammer the bench and base Continue reading
Our leaky shower
This shower looked beautiful when we bought the house but has since sprung many leaks and over 60 tiles are missing. Tomorrow it will be gone. Continue reading