We realized that there’s still a lot of things to be done for the basement, so Claire took the clones out of storage.
We have one week left to:
- Install 2 new doors
- Change one more light fixture
- Install carpet for the stairs
- Fix 4 way light switch
- Attach door mouldings
- Install kitchen backsplash
