We laid down the membrane for the laminate flooring on top of the plywood, This Zito membrane has adhesive joints and we also used vapor barrier tape to make sure everything stays in place.We have to wait another 24 hours before installing the actual floor. As per the instructions, we have to let the flooring acclimatise.

